Posted: Sunday 26 September, 2010
Before I wrote this, I thought I'd review the last post on this subject. The steel for the barn didn't arrive but should this week.
The upstairs is now pretty much all plasterboarded. The electricians have been putting in sockets and light switches, and the outdoor lights at the front door - they look very posh with the new door. The plumber was here yesterday and fitted the shower and the shower tray.
I'm not expecting anyone tomorrow, apart from the guy delivering the wood burner, but joiners should be back Tuesday, with the electricians and maybe, if we're really lucky, the plasterer. On Friday, the plant for the ground source heat pump should be delivered and installed.
Oh, and we've decided on black granite worktops in the kitchen - we need something indestructable! Still can't convince Dan about the tartan carpet, though.